MegaKim World Corp (Time Square)

Status Active Founded 2011 HQ Phnom Penh Markets Phnom Penh · Sihanoukville Completed 4 projects
Qualified Reviewed
The desk verdict

Genuinely delivered repeat builder — four towers completed through the post-2019 downturn. Capped by the model: ever-taller pre-sale towers, five projects at once, investor-grade pricing, and on-time claims resting mostly on the developer's own telling.

Taiwanese developer behind Phnom Penh's Time Square condo series — four towers delivered in BKK1 and Toul Kork since 2011, with an aggressive five-project pipeline now running simultaneously, including a 50-storey Russian Market tower and an Otres Beach debut.

Trust score 65/100
Founded2011
Head officePhnom Penh
Projects completed 4
Under construction 4
Condominium

Both sides, plainly

We name the downside as clearly as the upside.

Why we rate it
  • Real, repeated delivery: Time Square 1 (17F), 2 (30F, 2021), 3 (25F, 2023), and 5 (45F, 2025) are completed, occupied towers — including completions through the COVID and post-boom years that stalled many competitors.
  • Fifteen years in the market (since 2011) under one brand — longer than most of the condo cohort.
  • Prime, liquid locations: BKK1, Toul Kork, Russian Market — districts with the deepest resale and rental demand in the country.
  • Foreign (Taiwanese) parentage with a single-market focus on Cambodia, rather than a speculative regional land bank.
Watch items
  • Pipeline concentration: five projects in parallel (TS6, 7, 8, 10, plus sales on 9 and 11) is a lot of simultaneous pre-sale exposure for one developer — exactly the pattern that strains builders when sales slow.
  • Scale escalation: completed towers were 17–30 storeys; the pipeline is 45–50 storeys. Each generation is a bigger bet than the one the track record actually proves.
  • Investor-grade product: $40–65k one-bedrooms sell to yield-chasing foreign buyers, a demand pool that evaporates fastest in downturns — both a resale-liquidity and a developer-cashflow risk.
  • The Sihanoukville entry (TS10, Otres) takes a Phnom Penh-proven formula into the market with Cambodia's worst completion history.
  • On-time-delivery reputation is largely self-reported and agent-repeated; we found no independent audit of handover dates vs promises.

The full dossier

MegaKim World Corp is the most prolific pure-condo builder in this directory: a Taiwanese developer that has worked a single formula — mid-market towers in prime Phnom Penh districts under the Time Square brand — since 2011 [S-011] [S-077]. The formula has demonstrably worked four times. The question a buyer must answer is whether it works five more times at once, at fifty storeys, in two cities. Citations are marked [S-NNN]; the source list is at the end.

Who they are

MegaKim has developed in Cambodia since 2011 and markets itself on having “earned the trust of thousands of buyers by delivering every project on time and as promised” [S-077]. Agencies repeat the framing — “a strong track record of seven successful projects” [S-078] — though we have found no independent audit of promised-versus-actual handover dates, so treat the on-time part as self-reported. What is independently visible is the buildings themselves.

The delivery record

The completed series stands in the city’s most liquid districts [S-077]:

  • Time Square 1 — BKK1, 17 storeys, 78 units; the original.
  • Time Square 2 — Toul Kork, 30 storeys, finished 2021.
  • Time Square 3 — Toul Kork, 25 storeys, completed 2023.
  • Time Square 5 (306) — BKK1, 45 storeys, completed 2025.

Two of those completions landed in the hardest stretch of the modern market — the COVID and post-boom years that stalled hundreds of towers elsewhere. That is the strongest single fact in MegaKim’s favour, and it is not a marketing claim.

The pipeline — where the risk lives

The current book is far bigger than anything the record proves: Time Square 6 (48 storeys, BKK1, stated 2028), 7 (Toul Kork), 8 (50 storeys, ~700 units, Russian Market, stated Q4 2028) under construction, 9 and 11 in pre-launch sales, and 10 now under construction at Otres Beach in Sihanoukville after a December 2025 ground-breaking [S-077] [S-078]. Three things about it deserve a clear eye:

  • Simultaneity. Five-plus projects at once means pre-sale proceeds across the book are doing the funding work. If sales slow market-wide, every tower competes with its siblings for the cash to finish.
  • Height escalation. The delivered record tops out at 45 storeys completed in 2025; most of the pipeline is 48–50. Taller towers are longer, costlier builds with later break-even — the record is encouraging but not yet proof at this scale.
  • Price point. One-bedrooms from roughly $40,000 [S-078] sell almost entirely to yield-seeking foreign investors. That pool is the first to vanish in a downturn, which is precisely when an off-plan buyer needs the developer’s sales to hold up.

The Sihanoukville entry deserves its own sentence: Otres is a new market for MegaKim, carrying the coastal market’s well-documented completion history, and the Phnom Penh record does not transfer to it automatically.

The bottom line

MegaKim is a genuine, repeat-delivery developer — better evidenced than most of the off-plan market, with completions through the cycle’s worst years. The score stops in the mid-60s because the current pipeline is a materially bigger, more simultaneous, more leveraged-to-pre-sales bet than the one the record validates. A buyer in a completed Time Square tower is in a known quantity; a buyer off-plan in the 2028 generation should apply the full off-plan playbook — payment-schedule scrutiny, completion-risk pricing, and no reliance on the on-time slogan — and anyone considering TS10 should read our Sihanoukville research first.

Sources

Gallery / Visuals

Renders and project imagery from public developer material — credits & takedown policy.

Track record

What was promised, and what was delivered.

2025 Time Square 5 (306) BKK1, Phnom Penh · Condominium · 180 units · 45 storeys; ~180 residential units plus commercial space; completed 2025 — the tallest completed Time Square tower and the brand's BKK1 flagship. Completed
2023 Time Square 3 Toul Kork, Phnom Penh · Condominium · 200 units · 25 storeys; completed and occupied in the Toul Kork cluster alongside TS2. Completed
2021 Time Square 2 Toul Kork, Phnom Penh · Condominium · 78 units · 30 storeys; the project that established the Time Square brand outside BKK1, in the fast-growing Toul Kork district. Completed
Time Square 1 BKK1, Phnom Penh · Condominium · 78 units · 17 storeys; the 2010s original. Completed
Time Square 6 (302) BKK1, Phnom Penh · Condominium · 700 units · 48 storeys; construction from Q3 2023, completion stated 2028. Located on the same block as TS5, deepening the brand's BKK1 footprint. Under construction
Time Square 7 Toul Kork, Phnom Penh · Condominium · 500 units · 49 storeys per agency listings; under construction in the Toul Kork cluster alongside TS2 and TS3. Under construction
Time Square 8 Toul Tom Pong (Russian Market), Phnom Penh · Condominium · 700 units · 50 storeys; completion stated Q4 2028; 1BRs from ~$40k. The brand's first entry into the fast-densifying Russian Market corridor. Under construction
Time Square 10 Otres, Sihanoukville · Condominium · 400 units · Ground-breaking ceremony December 2025; actively selling from a stated $1,000/sqm with 1BR units reported sold out. First move outside Phnom Penh; treat as a new-market bet, not an extension of the PP record. Under construction
Time Square 9 (The Gatsby Residence) Street 278, BKK1, Phnom Penh · Condominium · 600 units · In pre-launch sales; 39 storeys; 1920s Art Deco Gatsby-inspired design; completion stated Dec 2029; from a stated $1,700/sqm. Planned
Time Square 11 (Time Castle XI) Street 113, BKK3, Phnom Penh · Condominium · 500 units · In pre-launch sales; 39 storeys; completion stated Jun 2029; 1BR from a stated $44k, 2BR from $87k. Planned
Borey Villa Phnom Penh · Mixed-use · Future planned mixed-use development integrating residential, commercial, and lifestyle elements per official site. Planned

Profile by Research Cambodia · Added 2026 . Developer assessments are opinion based on available information at the review date, not statements of fact or financial advice.